Enka & Bechtel
FIRM
Enka & Bechtel
DATE
2001-2003
LOCATION
Aliağa – İzmir / Adpazarı – Sakarya / Gebze – Kocaeli
WORKS DONE
Construction project, construction and installation of underground rainwater drainage systems and 6,000m sewage pipeline installation in various diameters for Bechtel Enka Izmir Aliağa Adapazarı Gebze Natural Gas Combined Cycle Plant. Underground HDPE pipeline isometric production and installation. Installation of high pressure lines between diameters of 42,000m Q40- Ql000mm. Production and installation of above ground PVC, U-PVC, C-PVC and GRP piping. Installation of firefighting systems, compressed air systems, raw water intake systems, cooling water cycling system and water systems (for drinking, utilization, fire, cooling, irrigation, heating and sanitary purposes).